Technical manuals

01 September 2021
HumeFilter® UPT – Installation guide
16 July 2021
Electrical Safety – Bushfire Mitigation Plan (BFMP)
24 May 2021
Case study – Yass Sewerage Scheme, NSW
01 May 2021
Humes Bebo Arch vs Conventional Bridge Design
01 March 2021
Tunnel and shaft solutions
01 March 2021
StormTrap® stormwater detention and infiltration
01 March 2021
Case study – Mobile precast capabilities
19 February 2021
Corangamite Water Skink EPBC Act Offset Strategy & Management Plan - Attachment D - Colac Quarry Extension (WA158), Victoria
01 February 2021
Corangamite Water Skink Management Plan - Attachment C - Colac Quarry Extension (WA158), Victoria
01 February 2021
HumeGard® GPT – Technical manual
01 December 2020
HumeCeptor® Class I – Technical manual
06 November 2020
Case study – DN3000 pipes
01 August 2020
StormTrap® system – Installation guide: SingleTrapTM model
01 August 2020
StormTrap® system – Installation guide: DoubleTrap™ model
01 March 2020
HumeGard® GPT – Installation guide
10 February 2020
Case study – Large-scale custom stormwater pits
01 November 2019
Rural solutions
01 April 2017
Stormwater treatment
01 April 2017
HumeCeptor® System – Installation guide
01 April 2017
HumeCeptor® system – Technical manual
01 April 2017
HumeCeptor® System – Inspection and maintenance guide (Issue 2)
01 April 2016
Crossing panels (Railway level crossing panels)
01 June 2015
Steel reinforced concrete pipes
01 June 2015
L and T walls